Ticket / Internal Ticket

SURVEI LOKASI BARU POP PADJAJARAN

Pattern stats, related by pattern, related by customer, raw ticket payload.

Pattern stats

Total 115Closed 106Resolved 1

Meta

Customer Internal TicketStatus closedPattern General connectivity / misc

Related by pattern

IDStatusSubject
#1305openRELOKASI MODEM SUNNAH SAEPUL
#1294in_progressPENARIKAN KABEL ODP 14.1.7
#1286openGANTI ADAPTOR AN LIANAH
#1272in_progressGANTI MODEM A//N ADINDA NURUL FADILAH
#1250closedPERBAIKAN OC.11.1/16 - SINBAR-ASPOL
#1212closedMANAGE SERVICE PT DANUSARI MITRA SEJAHTERA 10/09/26
#1202closedPERBAIKAN OP.5.1.12 KP SAWAH
#1201closedPERBAIKAN OP.16.1.3/8 GG AMIL
#1196closedMASUKAN KATASANDI AN Adi Tarmiadi
#1157closedPERBAIKAN ODP 3.1.2, 3.1.3, 3.1.7 PONDOK KENCANA

Related by customer

IDStatusSubject
#1300in_progressPERBAIKAN BACKBONE NAGRAK TO KATULAMPA
#1298closedMODEM LOSS AN FAYZA NURSALSABILA PUTRI
#1295in_progressMODEM LOSS AN POS PONDOK KENCANA
#1294in_progressPENARIKAN KABEL ODP 14.1.7
#1253closedPEMASANGAN POWER SUPPLY OLT ZTE C320 LALADON
#1252closedJALUR IATECH KEARAH KARADENAN PUTUS
#1250closedPERBAIKAN OC.11.1/16 - SINBAR-ASPOL
#1248closedPERBAIKAN OC.11.1/16 - SINBAR-ASPOL
#1247closedPPPOE OFF PADA OLT ISP-BJD-RAFALLD-C-01
#1246closedPENGECEKAN DAN PERBAIKAN ODC OC.15.1/16 - BENDUNGAN

Raw JSON

{"id":969,"customer_id":0,"ticket_type":"internal","eyzet_customer_id":"","eyzet_customer_name":"","employee_id":15,"assigned_role":"subscriber","request_by":"Internal Staff","topic_id":1,"subtopic_id":0,"channel_id":1,"subject":"SURVEI LOKASI BARU POP PADJAJARAN","description":"<ul>\r\n<li>Tim teknis diminta untuk melakukan survei ke lokasi baru POP Padjajaran </li>\r\n</ul>","status":"closed","priority":"medium","created_by":33,"created_at":"2026-07-29 16:13:38","updated_at":"2026-07-31 08:29:36","last_activity":"2026-07-31 08:29:36","company_name":"","topic_name":"Technical","subtopic_name":"","channel_name":"WhatsApp","status_label":"Closed","employee_name":"M Fikri Abillah","reply_count":3,"assignees":[{"type":"employee","value":"15","display_name":"M Fikri Abillah"},{"type":"employee","value":"10","display_name":"Dede Doni"},{"type":"role","value":"subscriber","display_name":"TS"}],"images":"","replies":[{"id":1831,"user_id":7,"display_name":"Muhammad Ichwani Iskandar","reply_text":"<strong>Schedule Created</strong><br>• Scheduled Date: July 30, 2026 7:40 am<br>• Created By: Muhammad Ichwani Iskandar<br>• Assigned To: M Fikri Abillah, Dede Doni, TS<br>• Status: changed from Open to In Progress","created_at":"2026-07-30 07:40:19"},{"id":1839,"user_id":0,"display_name":"","reply_text":"Tiket ini secara otomatis dijadwalkan ulang ke tanggal July 31, 2026 oleh sistem karena status sebelumnya belum selesai.","created_at":"2026-07-30 21:11:31"},{"id":1851,"user_id":32,"display_name":"Afifah Indriyani","reply_text":"<ul>\r\n<li>Telah dilakukan survei ke lokasi oleh tim teknis</li>\r\n<li>Dibutuhkan penarikan kabel baru ke odc, dan akan disiapkan oleh tim</li>\r\n</ul>","created_at":"2026-07-31 08:29:26"}]}